Wednesday - 07 January 2009
Published: 12 December 2006 04:20 PM
Source: The Engineer
Memorials having been received from the Whitechapel District Board and the St. George-in-the-East and Rotherhithe Vestries, urging the necessity for a new bridge over the Thames below London Bridge, it was resolved – ‘That, with a view to meet the great and increasing traffic, form the north-east to the south-east of London, it be referred to the engineer to report as to the most advantageous position for a bridge across the Thames below London Bridge, which would be best suited to meet the pressing requirements of the public.’…
| Bookmark with: |
| Job Title | Job Location | Job Position |
|---|---|---|
| SENIOR ESTIMATOR... | Yorkshire & the Humber | Permanent |
| Plant Manager... | London | Permanent |
| Mobile Gas Engineer (London M25)... | London | Permanent |
| Mobile Gas Engineer... | Greater Manchester | Permanent |
| Contracts Manager (boiler engines CHP)... | London | Permanent |
| GENERAL FOREMAN - EAST MIDLANDS... | England | Permanent |