Wednesday - 07 January 2009
Published: 04 September 2008 11:00 AM
Source: The Engineer Online
The contract, worth €122m (£99m) to Siemens and €67m (£54.5m) to Bombardier, includes options for 40 additional coaches.
113 coaches will be delivered to the SBB and eight to the Sihltal Zürich Uetliberg Bahn (SZU) between mid-October 2010 and March 2016.
Carbodys will be manufactured by Siemens in
| Bookmark with: |
| Job Title | Job Location | Job Position |
|---|---|---|
| Plant Manager... | London | Permanent |
| Mobile Gas Engineer (London M25)... | London | Permanent |
| Mobile Gas Engineer... | Greater Manchester | Permanent |
| Contracts Manager (boiler engines CHP)... | London | Permanent |
| Warehouse Manager... | Hampshire | Permanent |
| Quality (QA) Engineer... | Hampshire | Permanent |